g奶大爆乳交在线观看theav,一区二区亚洲av天堂嫩模,yin荡纯肉体育生np男男,波多野结衣av

您好!歡迎訪問蚌埠三合電子科技有限公司網(wǎng)站!
全國服務(wù)咨詢熱線:

18895606220

當(dāng)前位置:首頁 > 技術(shù)文章 > 外貿(mào)地磅參數(shù)配置及安裝步驟

外貿(mào)地磅參數(shù)配置及安裝步驟

更新時(shí)間:2016-08-21      點(diǎn)擊次數(shù):2940

一、技術(shù)參數(shù):

1、操作工況及技術(shù)條件

1.1 環(huán)境氣溫:-30℃~+65℃

1.2 稱重對(duì)象:車載特資

1.3 秤體 3X14M

額定稱重:50T\允許軸載30T

精度等:III

刻度20kg

臺(tái)面尺寸: 3m×14m   秤臺(tái)面板厚度:12mm

安全過載:150%F·S

承重臺(tái)超載:200%

結(jié)構(gòu)形式(稱體):U型鋼,箱式密封結(jié)構(gòu),模塊4節(jié)臺(tái)面式,臺(tái)面板厚度10MM,秤臺(tái)表里刷二道防銹底漆,表面噴灰色面漆。

穩(wěn)定時(shí)間:5秒

1.4 防爆傳感器 SQC-30T(橋式)

額定荷載30T;精度:0.02%(即0.02)

安全過載:150%F.S,極限過載:300%F.S

數(shù)量及選型:1臺(tái)

防護(hù)等:IP67

1.5 稱重信號(hào)處理系統(tǒng):

1.6 此套配置為我公司結(jié)合自向十年電子衡器制造經(jīng)驗(yàn)和中外先進(jìn)半導(dǎo)體技術(shù)的結(jié)晶。

1)重量顯示:冷色數(shù)碼顯示與超大LED顯示,(附加配置)即一臺(tái)秤有兩處同時(shí)顯示稱重?cái)?shù)據(jù),使用方便而又有保障。

2)有完整的自檢功能和強(qiáng)大的稱重信息管理功能。

3)非線性+0.01%OF FULL SCALL

4)靈敏度0.8ч V/D溫度系數(shù)  +0.0005%/℃

5)電腦鍵盤式操作鍵

6)電源220VAC 50HZ

7)功能:

◆*的皮重功能:

手動(dòng)皮重資料輸入

線上皮重資料查詢

200筆皮重資料記憶

◆萬年歷(時(shí)鐘功能):

可顯示年/月/日、時(shí)/分/秒,自動(dòng)閏年、閏月

精度:+ 5s/24h,不受斷電影響

◆顯示:

稱重儀表顯示:七位冷色數(shù)碼管顯示、狀態(tài)符指示(零點(diǎn)、不穩(wěn)定偵測(cè)、毛重、凈重、皮重輸入、電源) 

資料處理器顯示:背光彩色型液晶顯示屏、中文畫面顯示

◆大屏幕顯示和進(jìn)入電腦管理的接口設(shè)置

◆提供多種磅單格式:單張三聯(lián)式、非碳復(fù)寫式

1.7接線盒:專業(yè)穩(wěn)固型設(shè)計(jì),采用柔性橡膠密封、5PPM(百成分之五/℃)溫度系數(shù)

1.8精密電阻、防水接頭

1.9穩(wěn)壓電源:SANTAK UPSK500

2、安裝條件:

2.1 秤體為露天安裝,其他按供方要求

2.2 電壓220VAC (-15%~+10%,50Hz)

1. Check all goods against list, pay attention to the steel-seal letter A1、A2、A3、A4、A5、A6、A7、  A8、A9、A10、A11、A12 on the surface of the scale-bodies, load cells, tools wooden cases and   indicator (See the following figure).Be ready to install   A2 A4 A6 A8 A10 A12   A1 A3 A5 A7 A9 A11

2. Scale-body assembling:   Lift the scale-bodies of corresponding marking with the 28mm shackle and assemble with a crane   (usually 15t), overturn and lie them flat(pad wood under the scale bodies to prevent the paint scaling   off), attention to the marking.the marking of A1、A3 with the marking of A2、A4 of the scale-body, the   marking of A5、A7 with the marking of A6、A8 of the scale-body , the marking of A9、A11 with the   marking of A10、A12 of the scale-body, then tighten the scale-bodies with 96 sets of M20X60   socket head cap bolts with M30 adjustable spanner,M20 socket head cap spanner and φ30x500mm   lever. Each pair of bolts including 2 washer, 1 spring washer and 1 thickening nut. See the following   figure:  

3. Installing load cell  Tighten the M16X45 bolts with the lever. Each pair of bolts is including 1 washer and 1 spring  washer.    (Note: The marking on the load cell and scale-body should be consistent.)   Note:a. Install the load cell directly on the back of the markings A1、A2、A11、A12 of the scale-bodies.   b. Install the load cell on connecting-plate of the scale-bodies markings A3、A4、A7、A8 of the  scale-bodies.

4. Place the scale-body into the completed pit

4.1 Fix up one end of the four steel cable in the same length into the installation hole on the  scale-body which marked A1、A2、A3、A4 using the shackle, the other end of the steel cable should   cover with the crane. Ensure the scale-body in level when lifting. The degree of angle of the steel   cable should not less than 45°.   

4.2 Lift the scale-body above the foundation slowly, put δ25~δ30mm thicken wood plate   between the scale-body and the walls of the foundation pit to guarantee the scale-body into center   place. Then put the load cell's steel ball and base-plate of ball-bowl on the foundation plate. Position   scale-body into the foundation .See the following figure:   Thicken Wood  

4.3 Install the second-section scale-body which marked A5、A6、A7、A8, ensure the marking   A5、A6 of the second-section scale-body should be corresponding with the marking A3、A4 of   the first-section scale-body. Place this scale-body into foundation pit slowly and attention to the   position of the joint. make sure the joint hole of joint should be corresponding with the connect   forelock of the first section scale-body. attention to adjusting the clearance about 5~6mm   between the two sections of scale-bodies. The clearance around the scale-body is roundly the   same. See the following figure:

4.4 Lift and install the third-section scale-body(which marked A9、A10、A11、A12),ensure the   marking A9、A 10 of the third-section scale-body should be corresponding with the marking A7、A8   of the second-section scale-body. The installation step the same as the first and second section   scale-body.

5. Adjust the scale-body after placing is finished.

5.1. Check the eight steel-ball of load cell, If the steel-ball can be rotated, jack the scale-body up   in that position with the jack and put the level-adjusting plate under the installation plate for load cell   to make sure the steel-ball can't be rotated.   5.2. Adjust the M30x85 common limit bolts of the scale-body. (Rotate the bolt, it is better that there   is 5mm between the front-end of the bolt and the surface of scale-body, then rotate the nut.) In order   to avoid weighing accurate is not good from big rocking when the truck drives on the scale.

6. Pass out the signal cable from the passing-tube. Tie up the signal cable on the iron wire in the  passing-tube when passing. Then pull the iron wire to achieve the goal of passing. Next join the signal   cable to the junction box. (Attention to the marking on load cell and junction box should be consistent),   then fix up the junction box onto the two side-cover plates.) Then fixup the junction box on the side   cover-plate of the scale-body.

7. Fixup one end of the ground-cable onto the connecting-plate using M16 bolts, and fix up the other  end of the ground-cable onto ball-bowl base under-press using M12 bolts to let the load cell   short-connection, it will protects the load cell from damage by lightning when they are working.   ground-cable  

8. Install the side-cover plate of the load cell: fixup the the cover-plate of load cell on the scale-body  with 24 sets of M10×25 stainless steel common bolts. attention to the marking on the side-cover plate   and the scale-body should be consistent.  

9. Install the bracket: fixup the bracket on the side of the scale-body with the 36 sets of M16×35  common bolts(each pair including 1 washer, 1 spring washer, zinc-galvanizing treatment)  

10. Pass out the signal cable from the PVC tube in foundation and join it into the pounds-room.

11. The installation is finished.

蚌埠三合電子科技有限公司
地址:安徽省蚌埠市蚌山區(qū)聚云商務(wù)廣場(chǎng)1號(hào)樓722室
郵箱:623226630@qq.com
傳真:86-0552-3073177-808
關(guān)注我們
歡迎您關(guān)注我們的微信公眾號(hào)了解更多信息:
歡迎您關(guān)注我們的微信公眾號(hào)
了解更多信息
18款禁用免费安装的软件app| 在床上拔萝卜又疼又叫什么病| 日日天干夜夜狠狠爱| 97人人爽人人爽乱码av国产| 用舌头去添女人下面是不是真爱| 精品国产_亚洲人成在线观看| 午夜亚洲国产理论片2020| 名器紧致h拔不出来| 欧美午夜精品一区二区蜜桃| 人妻18毛片A级毛片免费看| 老男人把舌头伸进我下面| 性一交一乱一乱一视频| 国内精品一区二区三区| 琪琪婷婷五月色综合久久| 和搜子居同的日子hd高清看| 最近中文字幕免费高清MV| 亚洲AV不卡一区二区三区| 中国熟妇色xxxxx中国学生| 交换第一次| 我和公发生了性关系视频| 韩国三级日本三级美三级| 337P日本欧洲亚洲大胆色噜噜 | 欧美人与牲动交XXXX| 強開小嫩苞一區二區三區| 国产人妻777人伦精品hd| 亚洲AV无码乱码国产精品| 精精国产XXXX视频在线播放| 精品九九人人做人人爱| 公翁大龟挺进秀婷小说| 野外被三个男人躁一夜小说| jk萌白酱在椅子上喷水视频| 14表妺好紧没带套18分钟| 无码人妻一区二区三区精品视频| 狠狠色噜噜狠狠狠777米奇小说 | 久久精品国产亚洲AV四区| 精品无码一区二区三区亚洲桃色 | 无码国产精品一区二区免费vr| 精品少妇AY一区二区三区| 男人J桶进女人P无遮挡动态图 | 国产xxx69麻豆国语对白| 亚洲砖码砖专无区2023|